Gallery – Bathroom – Project 17

The dated fixtures and tile in this high-rise bath needed to go. We began with a complete tear out, which included removing the tub and re-piping for our shower. Tiling throughout the shower area included an accent row of glass mosaic tile for additional eye level appeal. Storage was nearly none existent so we installed cabinetry recessed into an adjoining closet without using any additional bathroom area.

Click on any image to view enlarged version.

First photos being the “Before” and ending with the final “After” photos.

Click Here to Go Back to Gallery