Gallery – Bathroom – Project 14

The existing Jack-and-Jill bathroom, done entirely with original subway tile, had become cracked and broken beyond repair causing extensive damage below the bathroom. The new bathroom was redone including a radiant floor heat system, 12″ x 12″ marble tile, and new fixtures.

Click on any image to view enlarged version.

First photos being the “Before” and ending with the final “After” photos.

Click Here to Go Back to Gallery