Bathroom Project #2

 
19 of 19
(click any image to view an enlarged version)

MainImage
 

PREVIOUS
PROJECT


ReverseProject

NEXT
PROJECT


ForwardProject
Reverse

PREVIOUS
PHOTO
Forward

NEXT
PHOTO


Thumb1
Thumb2
Thumb3
Thumb4
Thumb5
Thumb6
Thumb7
Thumb8
Thumb9
Thumb10
Thumb11
Thumb12
Thumb13
Thumb14
Thumb15
Thumb16
Thumb17
Thumb18
Thumb19
         

This Jack and Jill bathroom needed a complete revamp. Look at the before photos and you will see the bath had no plumbing wall at the end of the tub. After a complete gut and new electric and plumbing lines were installed, we built a new plumbing wall with a glass block top. The radiator was removed and radiant floor heat installed. After tub installation we began the wall tiling including the glass accent rows and accent storage cubby tile. Floor tile was installed with accent perimeter to follow floor layout.

 

 

 



samanco home
  |   carpentry  |   about us  |   gallery  |   testimonials  |   contact us  |  


Samanco Construction, Ltd.

All Rights Reserved ® 2002
Phone 773-298-0620